Calculation of the discharge capacity of the Sihlhölzli Bridge during the construction phase

Stephan Suter, 29. May 2026

The Sihlhölzli Bridge in Zurich is to be renovated and widened for pedestrian and bicycle traffic. To carry out the construction work using a temporary ford crossing, flow capacity calculations are required to determine the minimum protection elevation of the ford.

Situation map of the Sihlhölzli Bridge within the 3D city model of Zurich (City of Zurich, Geomatics and Surveying)